100% FREE · NO SIGNUP · NO PAYWALL

STOP RENTING
YOUR PROGRESS.

Gym apps wanted $15/month for a notebook with a timer. So I decided it was up to me — to build my own, and give it to the people who deserve it… everyone. Auto-filled sets, instant PR trophies, a coach that actually coaches. Free. Forever.

⚡ Lifting in 10 seconds 🔒 Your data, your phone 📲 Works offline
DiceSun Gainz workout logger showing a PR trophy and Coach advice
🏆 New PR detected
COACH · try 230×8–10
💸

Actually free

No ads, no subscription, no locked "pro" tier. Every feature, every day, zero dollars.

⚡

No signup

Open it and lift in 10 seconds. Want cloud sync? A free account is optional, never required.

🔒

Private by default

Your data lives on your device. Nothing sold, nothing uploaded — unless you opt in.

📲

Offline PWA

Installs to your home screen like a real app. No app store. Works in basement gyms with no signal.

🏋️

Built by a lifter

One person who got tired of the paywall — not a corporation harvesting your reps.

⚡ THE SMART LOGGER — TRY IT RIGHT HERE

Type a weight. Beat your best.

Your last session is already filled in — just beat the numbers. Go above your best and a gold trophy fires instantly. Watch your estimated 1-rep-max climb as you type, and The Coach tells you exactly what to do next. This is the real thing, live below.

🏆
Goblet Squat
LEGS · TARGET 3 SETS · 12 REPS
▶ FORM ⤺ HISTORY
Last: 50×10, 50×10, 50×10 · best 50 lbs · Est 1RM: 67 lbs
COACH Stay at 50 lbs and get every set to 12+ reps first.
#WEIGHTREPSRPE1RM
↑ Try typing 235 in a weight box — watch the trophy fire.

🏆 Live PR detection

Type a weight above your best and the trophy fires the instant you cross it — no save button, no waiting.

📈 Live e1RM (Epley)

Your estimated one-rep max recalculates with every keystroke, so you always know where you stand.

🧠 The Coach

Rule-based progressive overload: top the rep range and it tells you to add weight. Stall out and it suggests a deload.

🛟 Crash-proof

Saves from the second you start. Phone dies mid-workout? Nothing lost — "resume workout" is waiting.

Get the real thing — free →
THE HEADLINERS

Everything a paid app does.
None of the price.

The Smart Logger Interval runner Build your own split Progress dashboard Strength charts and calendar Shareable strength card High-protein cookbook
01

The Smart Logger

Auto-fills your last session so you just beat it. Live PR trophies, live Epley 1RM, and The Coach calling progressive overload per lift. Logs weight, reps and RPE — and it's crash-proof from set one.

  • Auto-fill from last session
  • Instant gold-trophy PRs
  • Stagnation & deload warnings
02

Timers that survive a dead phone

Every timer beeps and is anchored to the wall clock — accurate even if the app is closed or your screen's off. Whole-session timer, opt-in auto rest timer with 3-2-1 beeps, a single hold timer for planks, and a full-screen HIIT interval runner.

  • Full-screen interval runner (work/rest rounds)
  • Beeps + vibration, screen stays awake
  • Auto rest timer, 3-2-1 countdown
03

Build your own split

Unlimited custom programs: name it, pick a theme color, set the days, add exercises with sets, reps, rep-targets, timed holds or intervals, descriptions, and your own YouTube form links. Two pro programs are built in, free.

  • Difficulty color-coding per day
  • Per-exercise & whole-workout notes
  • Plate calculator + tap-to-watch form videos
04

A progress dashboard that hypes you

Training calendar (green = trained, gold trophy = PR day, blue = weigh-in), a streak system, auto weekly review insights, and milestone badges with confetti when you hit them.

  • Current / longest streak + monthly %
  • Auto weekly review
  • Tap any day for the full session
05

Strength levels & charts that draw themselves

Progression charts animate as they draw. Bench, Squat and Deadlift get graded Novice → Intermediate → Advanced → Elite against your bodyweight — showing the exact weight that unlocks the next tier.

  • Strength tiers vs bodyweight
  • Animated strength progression
  • Bodyweight tracking, 7-day average & trend
06

Share cards made for the feed

Auto-generated 1080×1350 flex cards for every PR, streak and strength level — your branding and dicesungainz.com baked on. One tap straight to Instagram or anywhere.

  • PR, streak & strength-level cards
  • Story-perfect 1080×1350
  • One-tap native share
07

Cookbook + cloud + backup

High-protein recipes with macros, checkable ingredients and a step-through method. Optional free cloud sync across devices. And one-tap backup/restore so you always own your data.

  • Macro-tracked recipes
  • Optional free cloud sync
  • Export / import everything, anytime
THE INTERVAL RUNNER

Full-screen.
Loud. Relentless.

Set your work/rest rounds and go. Giant countdown, audible beeps, haptic buzz, and the screen stays awake the whole time. WORK turns the screen green. REST turns it gold. No squinting at tiny numbers between rounds.

Run your first interval →
Interval runner work phase
Interval runner rest phase
SHAREABLE FLEX CARDS

Hit a PR? Post it.

Auto-generated, branded, and sized for stories. Your gains, your highlight reel.

Strength level share card — Intermediate Bench Press
Streak share card — 3 day streak
Progress and streaks dashboard
THE HONEST COMPARISON

Why pay rent on your own data?

Strong, Hevy and the rest charge monthly, gate the good stuff behind an account, cap the free tier, and monetize your training history. Here's the receipt.

DiceSun Gainz
Strong / Hevy
& other paid apps
Price
$0 forever
~$15/mo subscription
Use without an account
✓ Lift in 10s
✕ Signup wall
Free tier limits
✓ None — all features
✕ Capped (e.g. 3 routines)
Data stays on your device
✓ Private by default
✕ Cloud-first, harvested
Works fully offline
✓ True PWA
~ Patchy
Built-in coach / overload advice
✓ The Coach
✕ Mostly paid / none
Full-screen interval runner
✓ Included
✕ Rare
Auto share cards
✓ PR / streak / strength
~ Limited
Custom split builder
✓ Unlimited
~ Often gated
Own & export your data
✓ One-tap backup
~ Locked in
PRIVATE · OFFLINE · YOURS

Your reps aren't a product.

Everything you log lives on your phone. No account needed, nothing sold, nothing uploaded — unless you turn on free cloud sync yourself. Install it to your home screen and it works with the signal off. Want it on a second device? Sign in, sync, done. Want out? One-tap export and it's all yours.

No email capture No ads No trackers selling you Optional cloud sync Backup & restore Add to home screen
Account, sync and backup settings

It's free.
What's your excuse?

No download. No signup. No card. Open it and log your first set in ten seconds.

Open the app free → dicesungainz.com

…then tap Share → Add to Home Screen and it lives on your phone like a real app.